Успешное завершение социально важного проекта с участием КФАЭР в сфере здравоохранения на общую сумму $20 млн. Компания «Rhythm Plus» успешно завершила проект “Оснащение клиник медицинских ВУЗов и Республиканских клинических больниц современным
“Rhythm Plus conducted” a comprehensive environmental impact assessment in preparation for the construction of a solar photovoltaic plant in the Bukа district of the Tashkent region. A project for the construction of a solar photovoltaic plant on the terms of a
Akhborot 24 | Road construction in Bukhara based on China’s experience Reconstruction of 87 km of the A-380 Guzar-Bukhara-Nukus-Beineu highway on the 228-315 km section with
Akhborot 24 Special report / Construction of rural roads with cement concrete pavement in Surkhandarya region with a total length of 52.94 km, ADB Project. On the basis of the decree of the President of the Republic of Uzbekistan dated
Akhborot 24 | The reconstructed 240-kilometer section of the Kungrad – Beineu highway has been commissioned Rhythm Plus consultant on project management and construction supervision, Reconstruction of 240 km of the