Kungrad WPP Project, with 1500MW installed capacity and 300MW BESS to be located at Karakalpakstan

Wind Energy Development Program

About project

The 1500 MW Wind + 300 MW BESS project is a greenfield Independent Power Project IPP that is developed by ACWA Power in the Republic of Uzbekistan. JSC National Electric Grid of Uzbekistan shall act as the sole off-taker for the project under a 25-year PPA.

December.2023 — February.2024

Description of actual services provided in the assignment:
Engineer consultant Agreement for Kungrad WPP Project, with 1500MW installed capacity and 300MW BESS. Services of Rhythm Plus were limited to review and red-flag check of project documentation prepared by the Engineering Consultant for the compliance with local regulations and standards:

PHASE 1 – STUDY OF PROJECT CONDITIONS AND CONCEPT-LEVEL DESIGN:

  1. Study of input data (Project conditions, local regulations, RFP requirements,etc.).
  2. Optimization criteria & Suggestions.
  3. Concept-Level Design (incl. alternative design concepts, with pros and cons).
  4. BESS Concept-Level Design (Design Optimization in terms of LCOE).

PHASE 2 – BASIC (HIGH-LEVEL) ENGINEERING + BOQ:

  1. Calculations & Design Basis.
  2. Civil Engineering Package.
  3. Mechanical Engineering Package (WTG).
  4. Electrical Engineering Package (Wind Farm).
  5. Evacuation Infrastructures (Substations + OHL).
  6. BESS Engineering Package.
  7. SCADA, Security and Communications Engineering Package.

Customer (Client):

ACWA POWER

 

Funding Authority:

ACWA POWER

 

Budget
20.167
USD