Project Management and Construction Supervision, MFF-CS-P3, ADB Loan 2868-UZB:

Project CAREC

About project

CAREC Corridor 2 Road Investment Program (Project 3).

Июнь.2012 — Январь.2014

The Project involved the technical supervision of reconstruction of two sections of the A380 road, totaling 40 km, in Bukhara region (km 355-315) in accordance with the FIDIC conditions of contract.

Description of actual services provided in the assignment:

  1. Review the geometry, pavement, bridge, and other structural designs, drawings specifications, construction method etc., prepared by the employer. Recommend to revise or update the design for achieving greater economy, safety, reliability, and/or durability.
  2. Supervise the contractors work and certify the works in accordance with contract conditions.
  3. Contract Administration and Construction Supervision. Administer the civil works contract and supervise the day-to-day civil works on the site, and certify the works in accordance with FIDIC conditions of contract.
  4. Inspection of Contractor’s construction equipment, results of material and soil tests, safety of the works, property and personnel. Inspect and test all materials and works to ensure compliance with specifications and giving immediate notice to the Contractor to remedy in the event that such materials and works fail to comply with the specifications.
  5. Establish efficient procedures for verifying Contractor performance and reporting progress and problems in a timely manner, including quality control reports, quantity survey records, requests for variation or change orders, requests for time extension, and Contractor’s claims and invoices.
  6. Check “as-built” drawing prepared by the Contractors. Keep and record a complete set of as built drawings in paper and electronic formats for archiving in the Employers repository.
  7. Ensure that road safety design requirements are implemented in accordance with the contract documents and specifications.
  8. Assist the EA for provisional and final hand over by the contractors.

Monitor Contractors’ conformity with environmental and social impact controls, as well as with traffic control and road safety action plan during construction.

Customer (Client)

Road Fund under the Ministry of Finance of the Republic of Uzbekistan.

 

Financing organization:

Asian Development Bank (ADB)

 

Budget
1 499 555 / 668 175
USD